Got a little time Saturday to tack weld the boxing plates into the frame rails. Should have them all welded out in the next couple of weeks as my buddy and I both want it done before the 4th of July.
Rear Plates:
![Image](https://i786.photobucket.com/albums/yy142/dbrune_83/IMG_8132_zpsbaqur8yo.jpg)
![Image](https://i786.photobucket.com/albums/yy142/dbrune_83/IMG_8133_zpsdgblc0ll.jpg)
![Image](https://i786.photobucket.com/albums/yy142/dbrune_83/IMG_8134_zps6sux6g3x.jpg)
Front Plate:
![Image](https://i786.photobucket.com/albums/yy142/dbrune_83/IMG_8135_zpsxqosofqi.jpg)
We also talked ourselves into gusseting the four link front cross member on the bottom for two reasons, one we thought it needed it and two we had the plate so why not melt some metal. Will clean up the welds but this was about 10 minutes after they were welded up.
![Image](https://i786.photobucket.com/albums/yy142/dbrune_83/IMG_8136_zpsy3hwvzfz.jpg)
So from here about the last thing to weld up are the front lower control arm rear bushing mounts. Will need to do some research on that so that I can get the caster at about 5-6 degrees positive before we weld them up. This will allow for a couple of degrees of +/- adjustment down the road. I couple guys have done this and have some good write-ups on how to do it so I just need to reread those and fully understand what I am doing as this is critical like getting the four link setup right.